Tunnel formwork equipment La Línea section tolima 2
Customer: Hidalgo e Hidalgo
Country: Colombia
Location: Cajamarca - Tolima
Year: 2020
Description:
Section with several tunnels of the work in Colombia of the causeway of the Central mountain range crossing. The tunnels are small but separated from each other with paved sections and the formwork must be moved from one to the other. It is a formwork with reduced advance (6m) adapted to the characteristics and lengths of the sections to be executed and whose main characteristic of the equipment is that the advance movement is carried out by means of solid rubber wheels that allow a smooth movement through the terrain of the work and good maneuverability.
IDENTIFIED NEEDS:
What was the challenge?:
Tunnel formwork equipment La Línea section tolima 2
Customer: Hidalgo e Hidalgo
Country: Colombia
Location: Cajamarca - Tolima
Year: 2020
Description:
Section with several tunnels of the work in Colombia of the causeway of the Central mountain range crossing. The tunnels are small but separated from each other with paved sections and the formwork must be moved from one to the other. It is a formwork with reduced advance (6m) adapted to the characteristics and lengths of the sections to be executed and whose main characteristic of the equipment is that the advance movement is carried out by means of solid rubber wheels that allow a smooth movement through the terrain of the work and good maneuverability.
IDENTIFIED NEEDS:
What was the challenge?:
SEE WHAT ELSE WE’VE BEEN DOING
-
Scotland
-
PORTUGAL
-
Reunion Island
-
Hong Kong